Grenada Road and Slope Rehabilitation Design


Provided Climate vulnerability assessment and high-quality life cycle cost analysis  for the rehabilitation works which includes soil retention structures up to approximately 10 metres high, culverts, road works, and measures to protect slopes and road infrastructure. This project is being funded by the Caribbean Development Bank (CDB)

  • Work DoneTotal Infrastructure
  • Duration2017
  • CostTBD