Baha Mar Water System

New Providence, Bahamas


Project Description:

Design and construction of capital infrastructure works; including but not limited to potable water and reuse water distribution to accommodate the Baha Mar Project mega resort. The capital works consisted of 16, 20 & 24 inch potable water main distribution to accommodate the mega resort and com-munities in the surrounding area. The works also included reviews and approval of shop drawing and daily engineering inspections. Additionally, capital works encompassed QA-QC services for the installation of 16, 20 & 24 inch potable and reuse water main distribution inclusive of all hydrostatic, chlorination and bacteriological testing.

 

  • Project TypeDesign-Bid-Build Capital Infrastructure Project
  • Estimated Project Capital Cost US$90 Million
  • Project Duration2011-2012