Airport Gateway Project Water System

New Providence, Bahamas


Project Description:

Installation and commissioning of approximately 5 miles of 24inch potable water main (PVC) . The entire water main had to be in-stalled prior to commissioning, with a zero pressure drop over a 24 hour period required. Stringent QA-QC was required during installation and the pipe was super chlorinated using a slug methodology over the 5 mile stretch to ensure compliance with the specifications.

 

  • Project TypeDesign-Bid-Build Capital Infrastructure Project
  • Estimated Project Capital CostUS$72Million
  • Project Duration May 2010 - 2013