Edgewater Way Corridor, Grand Cayman, Cayman Islands
The National Roads Authority (NRA) of the Cayman Islands retained the services of CCG necessary to complete full design and construction drawings for the upgrade of the Edgewater Way in the Grand Harbour area. Edgewater Way is approximately 1700 feet in length and will form part of an intended service road link between Grand Harbour Shopping Centre and Kings Sports Centre. Edgewater Way is to be upgraded to a two-lane undivided roadway with sidewalks, improved drainage and lighting.
Improvements to Edgewater Way included:
- Cross section design-two travel lanes (undivided)
- Sidewalks on both sides,
- Drainage
- Utilities and lighting
- Work DoneDrainage, Utilities and Lighting, Sidewalks
- Duration6 Months
- CostN/A
Venetian Village Traffic Impact Assessment (TIA)
Village Road Improvement Project (VRIP)
The Rise West Bay Street Project Traffic Impact Assessment (TIA)
Nassau (Bahamas) Cruise Port Construction Site Surveying
Development Of A Master Plan For A Commercial Port At Great Exuma
North Abaco Port Project
error: Content is protected !!