Fairway Close Development Project (Wastewater System), Bahamas


This project was a major private subdivision design and construction of capital infrastructure works including but not limited to sanitary sewer distribution. The capital works consisted of sanitary sewer (gravity and force mains) and lift-stations to accommodate the subdivision. The works also included shop drawing review and approvals, engineering inspection and monthly reporting to WSC.

Provided design and construction supervision services which included design development, final design, design review, approval coordination with WSC, site monitoring and observations and consulting services for the capital works consisting of an 8 & 16 inch sanitary sewer [gravity and force mains] and lift-stations to accommodate the mega resort and communities in the surrounding area. Responsibility also included the coordination and oversight of all sewer lamp testing and commissioning of the sewer system works.

  • Work DoneGravity, Forcemain and Lift Stations Sanitary Sewer Design and Construction Supervision
  • Duration3 Years
  • CostUS $3 Million
error: Content is protected !!