Grand Bahama International Airport Landside and Airside Damage Assessment
Hurricane Dorian hit the Island of Grand Bahama over the period 1 – 3 September 2019, which resulted in significant structural and infrastructural damage and loss of key services to the GBAC International Airport facilities. Following the passing of Hurricane Dorian, sub-consultant retained for a post-hurricane damage assessment of the taxiway, navigational aids, and perimeter fencing as a consequence of the storm.
- Landside/Airside Pavement Damage AssessmentTotal Infrastructure
- Duration1 Month
- CostTBD