The New Providence Landfill Project consisted of constructing an additional cell consisting of excavation of over 11,000 cubic yards of material, base preparation, and installation of a leachate collection piping and structure system utilizing HDPE liner and pile penetrations of a linear system.The works also included installation of a leachate re-circulation system including a dual wall leak detection leachate sure pump series 95 with a pump control panel. Responsibilities included project estimation, site engineering, design review and project management for and on behalf of the contractor.