North Abaco Port Project

North Abaco, Bahamas


Project Description:

The port area is approximately 328,000 square meters for container stockyard, bulk cargo stockyard and yacht quay service area, and approximately 98,000 square feet area dredged for harbour basin. The port quays include: oil product berth; bulk cargo berth; general cargo berth; and container berth totaling approximately 1,732 feet. The design plan of dredge slope at bottom and retaining wall on the top is applied for the connecting part between berths. The approach channel is a width of 200 feet and 980 feet long. The dredge works in approximate quantity 950,000 cubic feet, includes 49,212 cubic feet of channel dredging and a large quantity of harbour basin dredging.

CCG provided project management, design review, construction supervision and contract administration for this project.

  • Project TypeDesign-Bid-Build Capital Infrastructure Project
  • Estimated Project Capital CostUS$39 Million
  • Project Duration2014-2016