Andros, Bahamas Landfill Project
The Andros Landfill Project was construction of a cell consisting of excavation and berm construction and installing a leachate collection piping and structure system utilizing HDPE liner. The works also included installation of an access roadway to the landfill. Lead consultant providing project estimation, site engineering, design review and project management for and on behalf of the contractor.
- Work Done Bid Estimation, Site Engineering and Project Management
- Duration6 Months
- CostUS$500,000